Fosterburg Road


SUMMARY

KEG Build, a Division of Kaskaskia Engineering Group, LLC, provided construction services on the Fosterburg Road Project, which consisted of pavement and shoulder widening, patching, Hot Mix Asphalt binder and surface courses, storm sewer, curb and gutter, and processing lime modified soils. The project was located on Fosterburg Road from north of Storey Lane, south for 0.56 miles in the City of Alton, Illinois. 

DETAILS

Owner:
City of Alton, Illinois

Client:
Kilian Corporation

Project Cost:
$1.6 Million

Completed:
2012


As a subcontractor to Kilian Corporation, KEG Build was responsible for pipe culvert and concrete headwall removals, miscellaneous curb and gutter and pavement removals related to the drainage work, over 4,900 feet of concrete storm sewer installation ranging from 12” – 24”, over 60 drainage structures, precast concrete end sections, approximately 1000 cubic yards of trench backfill, approximately 2 acres of seeding, perimeter erosion barrier, inlet protection, RR4 riprap, concrete collars and connections to existing drainage structures, and traffic control as needed for KEG Build contract work.


RELATED CASE STUDIES

 

 

A Complete Range of Services

We are a full service civil engineering, environmental, and contracting firm with an impressive portfolio of federal, state, county, and private project experience. 

Contact Us to Set Up an Appointment

(618) 233-5877 phone
info@kaskaskiaeng.com email